Commit Graph

6 Commits

Author SHA1 Message Date
0aa1a1b9b7 feat(entries+time-scheduling): add support for automatic breaks and inspection type configurations
- **Domain Enhancements:**
  - Introduced `PausenKonfiguration` and `BesichtigungsBlock` entities to handle automatic breaks and inspection scheduling.
  - Added `BesichtigungsTypE` enum for inspection types (`ZU_FUSS`, `ZU_PFERD`).
  - Updated `Bewerb` and `Abteilung` models to include pause and inspection type fields.

- **Service Updates:**
  - Enhanced `StartlistenService` to calculate start times, accounting for breaks and inspection buffers.
  - Extended `BewerbService` to support patchable time scheduling via new `updateZeitplan` API.

- **Persistence Changes:**
  - Updated tables (`BewerbTable`, `AbteilungTable`) to persist break configurations and inspection types.
  - Implemented repository mappings to include these new fields.

- **Testing:**
  - Introduced `BewerbeZeitplanIntegrationTest` to validate new scheduling behaviors, including automatic pauses and inspection handling.

- **Documentation:**
  - Added rulebook and conceptual documents for inspection and scheduling logic in `docs/01_Architecture/`.
2026-04-11 12:21:42 +02:00
6e484ee9a1 Update MASTER_ROADMAP with Offline-First product focus and Phase 8 milestones. Add detailed concept document for Desktop↔Backend synchronization (konzept-offline-first-desktop-backend-de.md). Mark Sprint C tasks C-1 and C-2 as complete and link ADR-0021/0022 dependencies. 2026-04-03 22:52:19 +02:00
236876a043 docs: restructure and streamline sprint execution order
- Consolidated and removed redundant steps in `SPRINT_EXECUTION_ORDER.md`.
- Simplified descriptions and roadmap formatting for improved clarity.
- Updated progress and dependencies to align with Phase 8 objectives.
- Adjusted role-specific roadmaps to reflect the latest sprint updates.

Signed-off-by: Stefan Mogeritsch <stefan.mo.co@gmail.com>
2026-04-03 09:43:11 +02:00
bbe5b1a357 Finalize domain model: define event → tournament → class → division hierarchy, multi-tournament account structures, and event-wide cashbox aggregation logic. Add division types and update glossary tasks. 2026-04-02 17:53:49 +02:00
898d249d41 Document Tenant-Resolution strategy: finalize ADR-0021 with schema-per-tenant approach, add detailed implementation guidelines, and update Architect Roadmap. 2026-04-02 16:38:36 +02:00
7e16b3f318 docs(roadmaps): add sprint execution order and detailed role-specific roadmaps
Some checks failed
Build and Publish Docker Images / build-and-push (., backend/infrastructure/gateway/Dockerfile, api-gateway, api-gateway) (push) Has been cancelled
Build and Publish Docker Images / build-and-push (., backend/services/ping/Dockerfile, ping-service, ping-service) (push) Has been cancelled
Build and Publish Docker Images / build-and-push (., config/docker/caddy/web-app/Dockerfile, web-app, web-app) (push) Has been cancelled
Build and Publish Docker Images / build-and-push (., config/docker/keycloak/Dockerfile, keycloak, keycloak) (push) Has been cancelled
- Added `SPRINT_EXECUTION_ORDER.md` to define the cross-role sprint step sequence.
- Created individual roadmaps for Architect, Backend, Frontend, DevOps, Rulebook, QA, UI/UX, and Curator.
- Captured developer responsibilities, dependencies, and timelines for Sprints A–C.
- Aligned sprint planning documentation with session log agreements.
- Provided structured documentation in `docs/04_Agents/Roadmaps/`.

Signed-off-by: Stefan Mogeritsch <stefan.mo.co@gmail.com>
2026-04-02 14:35:54 +02:00