meldestelle/docs/01_Architecture/Minisforum-MS-R1/Biest_Roadmap.md
StefanMoCoAt f79b14348b chore(docs): add detailed MS-R1 roadmap, SSH setup guide, and archive outdated setup docs
- Added "Biest Roadmap" covering Gitea infrastructure phases and tasks.
- Documented SSH client setup for Gitea integration with Cloudflare Tunnel.
- Archived outdated host setup and service configuration guides (`Setup_Guide_Services.md`, `Setup_Guide_Host_OS.md`).
- Introduced a centralized configuration and operational guideline (`MS-R1_Konfiguration&Bedienung.md`).
2026-02-09 00:35:41 +01:00

1.2 KiB

Roadmap: Finalisierung Gitea-Infrastruktur (MS-R1)

Phase 1: Konnektivität & Erreichbarkeit 🌐

  • Schritt 1: Cloudflare Tunnel (Tor zur Welt)
    • Ziel: Sicherer Zugriff über git.mo-code.at ohne Portfreigabe.
    • Status: ABGESCHLOSSEN (siehe Gitea-SSH-Setup.md).
  • Schritt 2: SSH-Key & Git-Client Setup
    • Ziel: Passwortloses "Push & Pull" über Port 2222.
    • Status: ABGESCHLOSSEN (siehe Gitea-SSH-Setup.md).
  • Schritt 2b: Erster erfolgreicher Push
    • Ziel: Validierung der gesamten Kette (Laptop → Cloudflare → Tunnel → Host → Container → Gitea).
    • Status: ABGESCHLOSSEN.

Phase 2: Datensicherheit & Resilienz 🛡️

  • Schritt 3: Die "Biest-Versicherung" (Automatisches Backup)
    • Ziel: Nächtliche Snapshots des LXC-Containers + SQLite-Dumps auf den Host-Speicher.
    • Status: Ausstehend.

Phase 3: Kommunikation & Feinschliff ✉️

  • Schritt 4: SMTP-Integration (Brieftaube)
    • Ziel: E-Mail Benachrichtigungen über mo-code.at Domain.
    • Status: Ausstehend.
  • Schritt 5: Gitea-Update-Protokoll
    • Ziel: Dokumentation des Prozesses zum manuellen Tausch der Binary.
    • Status: Ausstehend.